This is a detail cost entry record which is accessed by left-double-clicking mouse on any record. This entry is made to record work performed by your employees. This record (cost accounting) and the Purchase record (Fund Accounting) are the two screen that drive Visual R&B IMSĀ®. The only mandatory field on the screen is the Project field - all other field are optional and dependent on what detail you require for management and reporting. This screen drives over 20 other tables. And, with our speed up keys you can make an entry in just a few seconds.
For normal data entry you would use a different access point: From Quick Menu -> Work Performed button. The only field that must be filled in is the Project field (first button). If all fields are utilized this single record updates over 20 related tables with relevant data - enter whatever detail information you want to have returned to you in reports and analysis.
The action of changing the work order name from OWO- to and open project is what closes Work Orders. If the work order has other records that should be attached (several people working, several pieces of equipment used or sever different inventory items) use the COPY button on the Browse to save 60 - 90% of your keystrokes.
After entering the first record, click COPY button and change only what fields are different; i.e. if the first record represents 8 hours for Mike Smith and Jim Daniels also worked on the work order then clicking copy after the first record is entered will save you from 20 to 50, or so, keystrokes.
Using the Copy button always saves keystrokes, but, in the case of closing work orders, it also copies information from the first work order to all those that are copied, that ties the work order together so reports showing all people, material and equipment used on any work order can be printed.
Road Street Button

Select asset group that is being worked on - if asset is a:
- Road-Street-Segment and is not in your Road/Steet Table -> select first Rd/St button
- Road-Street-Segment is is in your Road/Street Table -> select second Rd/St button
- Bridge -> select the Br button
- Culvert -> select the Cu button
- Sign -> select the Si button
- Other Asset -> select the OA button
|
|
|
Project button

Select Project you want to charge this work record to
|
|
|
Labor button

Select the employee doing the work
|
|
|
Township

Select Township or District where work is being done
|
|
|
Hours Previously Worked

When an employee is selected from the Labor Lookup the regular and overtime hours previously worked in the current work week is displayed. This provides instant feedback on how many hours this particular employee has worked and how many hours are left in work week.
|
|
|
Current Fisal Year

Default Fiscal Year for this record
|
|
|
Equipment button

Select what piece of equipment is being used by this employee on this job - if none, then leave blank.
|
|
|
Surface Type button

Select surface type (if desired)
|
|
|
Memo Informatin

Memo entry for longer notes about this particular work record.
|
|
|
Client area

Phase of work for this record (if used);i.e., pre-engineering, base, etc. Also used in conjunction with ReCurring Work Orders to record what work order to charge cost record against.
|
|
|
Phase Designator

You can set up your own phase of work designators and charge records accordingly; i.e., pre-engineering work versus new construction versus . . . . ..
|
|
|
Inventory Relief

If Material is selected and it is in your inventory a check mark her removes material from perpetual inventory. Unchecked means this record does not remove material from your inventory.
|
|
|
Work Date

Date work is performed on
|
|
|
Record Number

Record number of this entry
|
|
|
Material button

Material lookup
|
|
|
Layers button

If you would like to keep track of the cost of each layer of road surface in current construction then designate it with this table.
|
|
|
Task button

Task (type of work) this record represents; i.e, operating a grader, cleaning ditches, spraying weeds, etc. - this is another table you fill out to make system reflect you requirements.
|
|
|
Labor Rates

If employee has more than one active pay rate (depending on the type of work being performed) the system will store multiple pay rates for that employee. Once stored you only need to select it when that employee is doing work that is compensated under a different pay rate. Example: in the current work year an employee may operate a grader, operate a welder, operate a pick and shovel - if he/she is compensated at different rates by the type of work performed then you may want to set up this table selector.
|
|
|
Project Number

System assigned project ID number - maintained by system
|
|
|
GL A-C

Labor General Ledger account number - default is set in the employees home record and you can override it at entry if desired.
|
|
|
Regular Hours

Regular hours worked
|
|
|
Overtime Hours

Overtime hours worked on this record
|
|
|
OT Rate

Overtime Rate paid
|
|
|
Labor Cost

Total Labor cost on this record
|
|
|
Labor Rate

Default labor rate for this employee
|
|
|
OK button

Save edits and updates on this record
|
|
|
Check box

Check this box if you want to record overtime hours worked but DO NOT want to record Overtime costs for this record
|
|
|
Comp Time

Point mouse at Other box, right-click and select they type of comp time, vacation time, etc. this record represents.
|
|
|
Units of Work

This field is used in conjunction with the TASK and its measurement attribute. If the task is, for instance, mowing and the task measurement is by acres then the Units of Work would record, for instance, 32, if the record costs represent 32 acres of mowing.
The Task setup (as well as most all set ups) are located from the ToolBar -> Menus -> Functional Menu -> Setup Tab.
|
|
|
Eqp Rates

If a piece of equipment is configured in different ways, for example, in winter our dump trucks are outfitted with snow plows and cinder spreaders. The rate charged when this dump truck is working should be more than when not configured in this manner. The multiple equipment rates table is filled in from the Equipment home record and selected from this button at data entry time - or you can set the default rate to the new rate.
|
|
|
Hours or Miles

Hours or miles this equipment was used on this record. The default mile or hour meter is set on the home equipment record.
|
|
|
Weed Control

Check if this is a Weed Control cost record and assign it to the appropriate weed control project.
|
|
|
Memo cost

Check if this is a record you do want to associate with the selected project but DO NOT want it to show costs on that project.
|
|
|
GL Account Number button

Material General Ledger account number - default is set in the Inventory Item's home record and you can override it at entry if desired.
|
|
|
Convert

Built in converter to for instance calculate what portion, 12 quarts of oil is, of a 55 gallon barrel of oil. You may inventory oil, for instance, by the barrel, but when used in the shop it normally is measured in quarts or gallons. Configure converter to any attributes.
|
|
|
Equipment Exp

Check this box if the record you're entering is a charge to a particular piece of equipment versus when the equipment is running on a job. If, for instance, Jim is refueling a piece of equipment then this box should be checked - two yellow boxes appear to the left. Enter the work date and meter reading in those boxes to record when it was fueled and the gallons of fuel in the Inv# field.
|
|
|
Record Audit

Automatic record audit function. This record may update over 20 tables with bits of data that drive the overall system so audit function is automatic.
|
|
|
Material Units

Enter units of material for this record. The cost per unit will load automatically if is is entered in the Inventory record.
|
|
|
Inventory Loc

This is the inventory (physical) location for the material applied.
|
|
|
Quarry Ticket

If this record represents one of your trucks, for instance, hauling rock from a 3rd party quarry to a road location the driver will get a Quarry Ticket and the number should be entered in this field if you want to utilize the automatic Quarry Ticket reconciliation module.
|
|
|
Alt Units

If you record material on two basis, for instance, material by the yard and by the ton this is the alternate tracking field. The primary tracking field is normally determined on the purchases quantity measure; i.e., if you purchase rock by the ton then is normally is inventoried by the ton and relieved from inventory by the ton - - therefore, the alternate field (if you use it) is by the yard measurement.
|
|
|
Total Cost

This is the total labor, equipment and material costs for this record.
|
|
|
RS check - Inc Switch

Check this box if this record entry closes out a Master Plan on an individual Road, Street or Segment in the Road/Street table.
The Inc switch (just above the R/S switch but not in this picture), when checked, means this record does not complete the TASK and/or the WORK ORDER which this record is being entered on.
|
|
|
State Maint Code

This is the state maintenance code that relates to the local TASK code. It's setup is from the main ToolBar -> Menus -> Other Menus -> Functional Menu -> Setup button
|
|
|
Converter

This converter uses the alternate units (if used) for its conversion basis.
|
|
|